Building new or adding on in Broward County means the electrical system has to be planned before walls go up, sized for the load you will really use, and built to handle heat, humidity and storms. Here is how we think about that work, step by step, and what you can do to keep it smooth.
Why the Electrical Plan Comes Before the Framing
The best electrical work on a new build or an addition is decided long before anyone pulls wire. When we sit down with an owner, a builder or a designer, we want to see the floor plan, the elevations and a rough idea of every appliance, air handler, water heater, pool pump and charger that will live on the property. That list drives the size of the panel, the number of circuits and the routes the cable will take through framing and block.
Skipping this step is how owners end up with a panel that is already full on move-in day, or with a beautiful kitchen that has one receptacle in the wrong place. In Broward, where air conditioning runs most of the year, the cooling equipment alone can decide how large the service needs to be. Planning early also lets us flag conflicts, such as a main panel location that would end up behind a future cabinet.
A good plan is not a mystery document. It is a set of decisions you can read: where the panel sits, where each circuit goes, which rooms get dedicated lines, and where spare capacity is left for later. We walk owners through it in plain language so the first time they see the layout is not after the drywall is hung.
A practical way to test a plan is to walk through a normal day in the finished building. Where do you drop your keys and charge your phone, where does the coffee maker sit, where does the vacuum plug in, and which room gets the space heater or portable fan on a hot evening? If a step in that day has no convenient outlet or switch, the plan is not finished yet. We ask these questions out loud because drawings rarely show how people really move through a house, and a few minutes of imagination now prevents years of extension cords.
What an Addition Does to the Service You Already Have
An addition is not just new rooms. It is new demand on a service that was sized for the house as it used to be. A family room, a bedroom suite or a second-floor expansion adds lights, receptacles, cooling load and often a bathroom with its own protected circuits. Before we promise anything, we look at the existing meter, service conductors, main breaker rating and panel to see how much room is really left.
Many older Hollywood and Broward homes were built with modest electrical services, and some still carry original panels that are crowded or hard to get parts for. Sometimes the addition fits comfortably on what is there. Sometimes the honest answer is that the service or the panel needs to be upgraded as part of the project, and it is far better to learn that during planning than during a failed inspection.
We also check the condition of what the new work will connect to. Old splices, overloaded circuits and ungrounded receptacles in the existing part of the house do not become safe just because a new wing is wired correctly. We explain what we find, separate what is required from what is optional, and let the owner decide how far to go.
If your addition includes a second story or a conversion of a garage, think about how the new space will be used in practice. A garage turned into a bedroom needs bedroom-grade lighting, receptacle spacing and alarms, not just the sparse wiring a garage had. A bonus room that becomes an office needs data cabling and enough circuits for equipment that runs all day. We document what exists, mark what must change, and describe the difference between the old use and the new one so there are no assumptions hiding in the paperwork.
Load Planning in Everyday Terms
Electricians use a calculation method to estimate how much power a building may demand, and the code provides the rules for it. You do not need to do the math, but it helps to know the idea. Square footage sets a baseline for general lighting and receptacles, and then fixed items are added: the kitchen circuits, laundry, bathroom circuits, water heater, dryer, range and the cooling and heating equipment.
The point is not to wire for the worst day every day. The point is to make sure the service, the panel and the wire sizes can carry what the building will reasonably ask of them without nuisance trips, overheated conductors or voltage sag at the far end of a long run. Choices like a heat pump water heater, an induction range or an electric vehicle charger change the picture, so we ask about them early.
Spare capacity matters too. A panel with open spaces and a service with headroom lets you add a workshop outlet, a mini split or a pool heater later without tearing anything out. We often suggest leaving room on purpose, because in a growing household the cost of foresight is small and the cost of retrofitting a full system is large.
One more habit worth building is keeping a written list of loads you might add in the next ten years. Typical entries include a mini split for a back room, a hot tub, a workshop with a compressor, a second refrigerator in the garage, an electric vehicle charger or rooftop solar with battery storage. The list does not have to be firm. It simply tells us where to leave conduit stubs, spare breaker spaces and extra capacity so that tomorrow's upgrade is a small job instead of a major reconstruction of the system.
Building Electrical for Block, Slab and Humid Air
Construction in Broward is different from construction in colder places. Many homes sit on slabs with concrete block walls, so there is no basement and often no easy crawl space. That means conduit may need to be set before the slab is poured, and wall runs may be channeled into block or routed through furring and framed sections. Getting the pre-pour layout right is critical, because moving a slab sleeve afterward is expensive and disruptive.
Humidity and salt air are the other constant. Inside walls, attics and exterior boxes, moisture finds every weak point. We pay attention to the right enclosures, the right wire types for wet or damp locations, sealed penetrations and corrosion resistant hardware, especially closer to the Atlantic and the Intracoastal. Cheap fittings that look fine in a dry climate can rust or swell here within a few seasons.
Attics get very hot, and cable running through them is derated by the code for that heat. We take that into account when sizing conductors, rather than treating every run as if it were in a cool basement. These details are invisible once the ceiling is closed, which is exactly why they need to be right the first time.
Concrete work leaves no second chances. Once a slab is poured, any missing sleeve or misplaced stub becomes a core drilling job or a surface-mounted workaround that looks like an afterthought. We recommend walking the slab layout with us and the builder before the pour, checking sleeve locations for the panel feed, kitchen island, floor outlets and any future additions. Taking photographs and measuring from fixed points such as corners gives everyone a record, so that later the location of every buried line can be found without guessing.
The Rough-In Stage: What Happens While the Walls Are Open
Rough-in is the stage when boxes are set, cable and conduit are run, and everything is left ready for the inspector before insulation and drywall. This is when your decisions turn into physical locations, so it is the best time to walk the space with us. Stand where the bed, the sofa and the desk will be, and tell us where you will want outlets, switches, lighting and data lines.
We look at box heights, spacing along walls, switch placement at doorways, and whether three-way switching makes sense for hallways and stairs. We plan for ceiling fans with proper support, recessed lighting that matches the insulation and ceiling type, and low voltage runs for networking or cameras. Each of these is far easier to place now than after the finish work.
The inspector will want to see the work exposed and unfinished, so the schedule needs to leave a window between rough-in and closing the walls. Coordinating with plumbing, mechanical and framing crews matters a lot here. We try to keep our runs organized and labeled so the next trade does not cut through them, and so that years later anyone opening the wall can understand what they are looking at.
A short rough-in checklist keeps things on track. Confirm every box is secured and at the intended height, every cable is supported at the intervals the code expects, and every hole drilled through framing is protected where required. Check that nothing was nicked by other trades, that low voltage runs are separated appropriately from power, and that nothing is stuffed behind where insulation will be pressed. We go through these items ourselves before the inspector arrives, because it is cheaper to find our own mistakes than to have them cited.
Panels, Meters and Working With the Utility
For a new service or a larger one, the meter, the service entrance and the main panel are all part of a connected package. The utility has its own requirements for meter locations, clearances and how the service is brought in, and the building department has its own review. We plan the equipment location with enough working space in front of it, away from places that flood or get blocked, and where the meter reader and future technicians can reach it.
In coastal Broward, panel location is also a resilience decision. Equipment that sits low in a flood prone area is vulnerable, and elevating or relocating it can be worth considering on a new build. Exterior equipment should be rated for its environment, and it should be mounted so water running down a wall does not find its way into it.
The utility connects and disconnects its side of the system on its own schedule, and the timing of that work is outside our control. We explain the sequence to owners so they understand why the lights may not come on the moment the final inspection passes, and we help coordinate so the steps happen in the right order instead of leaving a finished house sitting dark.
Think, too, about what the finished service will look like years from now. Clearly labeled breakers, a directory that matches the real circuits, and a neat arrangement of conductors make life easier for the next electrician, the next owner and any insurance or home inspector who visits. A panel that is cluttered or mislabeled is not only annoying, it slows down emergency response when someone needs to shut off a single circuit quickly. We label what we install so the owner holds an accurate map of the building.
Storm Season and the High Velocity Hurricane Zone
Broward County sits within the High Velocity Hurricane Zone, which shapes how buildings are made and how things get attached to them. For electrical work, that means exterior equipment, conduit, fixtures and mounting hardware need to be installed with wind in mind. Surface mounted conduit and fixtures should be strapped and fastened properly, and penetrations through the building envelope need to be sealed so rain driven by high wind does not follow a wire inside.
Planning for outages is part of storm readiness too. Many new homes now include a generator inlet, an interlock or a transfer switch so a portable or standby generator can be connected safely without backfeeding the utility lines. Backfeeding is dangerous for line workers and for your own equipment, which is why a proper transfer arrangement is installed and inspected rather than improvised.
Surge protection is worth discussing as well. Florida has frequent lightning, and a whole-home surge protective device at the panel, along with point-of-use protection for sensitive electronics, reduces the odds of losing appliances to a nearby strike or a utility switching event. It is not magic, but it is a sensible layer, and a new build is the cheapest moment to add it.
After a major storm, utilities and electricians can be stretched thin, and homes without safe generator provisions often wait longer or take shortcuts. Having a proper inlet, interlock or transfer switch in place before a storm approaches reduces both stress and risk. It also helps to know which circuits you would want powered during an outage, such as refrigeration, a few lights, internet equipment and perhaps one cooling unit, so the transfer arrangement can be sized around real priorities rather than guesswork.
Circuits the Code Now Expects in New Work
Modern electrical codes ask for more protection than older homes were built with. Arc-fault protection covers many living area circuits, ground-fault protection covers kitchens, baths, garages, laundry areas and outdoor receptacles, and tamper resistant receptacles are standard in dwellings. Smoke and carbon monoxide alarms are interconnected so that when one sounds, they all do. These are not upsells; they are what the inspector will look for.
The kitchen alone has a list of expectations: small appliance circuits for the counter, dedicated lines for the dishwasher, disposal and microwave in many layouts, and a properly sized circuit for the range or cooktop. Bathrooms need their own protected receptacle circuits, and laundry rooms need their own as well. We design these so that one appliance running does not blackout half the house.
Where the code is general, we try to explain it in general terms and avoid pretending to quote every section. Details change between code editions and local amendments, and the building department is the final authority on what applies to your project. Our job is to build to what is required, tell you honestly where we think extra capacity is worth it, and let you choose.
Dedicated circuits deserve a short explanation. A dedicated circuit serves one appliance or one purpose, so the device gets the current it needs without competing with a toaster or a hair dryer. Refrigerators, microwaves, dishwashers, disposals, washers, dryers, water heaters and air handlers often fall into this category, along with equipment in garages and workshops. The extra cable and breaker are a small part of the job, and they pay back as fewer tripped breakers and lower stress on conductors and terminals.
Outdoors, Pools, Garages and Detached Buildings
Florida living spills outside, and so does the wiring. Patios, outdoor kitchens, landscape lighting, pool equipment, gates and detached garages or guest houses each bring their own requirements. Wet locations call for weatherproof in-use covers on receptacles, ground-fault protection, and fittings rated for sunlight and moisture. Pools and spas bring bonding and clearance rules that exist to prevent shock in and around water.
A detached structure usually needs a feeder from the main building, and the size of that feeder depends on what will run there. A simple storage shed with a light is one thing; a studio with its own cooling and a kitchenette is another. We talk through the intended use before choosing the wire, the underground conduit and the sub panel, because buried work is painful to redo once the landscaping is in.
Trenches, conduit depth and protection from damage all matter, as does marking where the lines run so a future fence installer or irrigation contractor knows to be careful. We also try to avoid sending a feeder along a route that will later be paved or built over. Thinking about next year's patio now saves digging it up later.
Lighting outdoors is both a safety and a security matter. Path lights, entry lights and driveway fixtures need to be wired on circuits that make sense, with controls such as timers, photocells or smart switches that the owner can understand. Fixtures should be rated for damp or wet locations, and the fasteners should be stainless or coated to resist coastal air. We lay out outdoor circuits so that adding a fixture later does not mean overloading a line that already feeds the garage and the porch.
Permits, Inspections and the Order of Events
Where the code requires it, electrical work on new construction and additions is permitted and inspected through the local building department. That usually means plans or a work description go in before work begins, and then inspections happen at set stages, commonly rough-in and final, with other checks depending on the scope and the jurisdiction. Municipalities in Broward do not all run identical processes, so we confirm how each one wants things submitted.
We never promise that an inspection will pass or that an approval will arrive by a certain date. What we can do is build to the code, keep the work accessible and organized for the inspector, and fix anything that is flagged. Sometimes a correction is small, like a missing cover plate; sometimes it requires reworking a circuit. Either way, it is better handled promptly, with the inspector's notes in hand.
Owners benefit from understanding the sequence. Rough-in comes before insulation and drywall. Final comes after devices, fixtures and covers are installed. Utility coordination and any special inspections may sit between those steps. When the schedule is clear, the other trades are less likely to close up a wall too early or to hang finishes over work that still needs to be seen.
When a project involves a change of scope, such as a bigger kitchen or a moved wall, the permit documents may need to be updated before work continues. It is tempting to proceed and sort out paperwork later, but unpermitted changes can create trouble during the final inspection, when selling the property or when an insurance claim is filed. We would rather pause briefly, adjust the documents, and keep the project clean than leave the owner holding a problem that surfaces years afterward.
What You Can Do to Prepare
The most useful thing an owner can bring to us is a clear picture of how they live. Tell us whether you work from home, run a workshop, plan to add solar, own or expect to buy an electric vehicle, or like to entertain outdoors. Gather the plans, any engineering or energy documents, the appliance and equipment model information when you have it, and photos of the existing panel and meter if you are adding on.
Make decisions on fixtures and special features early. Lighting that arrives late can force a change in box type or support. Smart switches, networked lighting and whole-home audio need conduit or cable routes, sometimes a neutral at the switch, and a place for equipment. Choosing these before the walls close is much cheaper than trying to fish wire afterward.
Be realistic about access and scheduling. We need open, safe working space, clear paths to the panel location, and coordination with other trades. Jobs are quoted after we understand the work, and in some cases that includes a visit; any service call charge is explained before we are dispatched. Ask questions at any point, because a short conversation early is always better than a surprise later.
Finally, ask for a walkthrough at the end. We like to show the owner where the main shutoff is, how the breakers are labeled, how to reset a ground-fault device, and how to test smoke and carbon monoxide alarms. A short tour takes only minutes and helps new occupants respond calmly to a tripped circuit or an outage. It also gives you a chance to point out anything that does not feel right while the work is fresh and the crew is still on site.
What Can Go Wrong and How We Reduce the Risk
The usual problems on new construction and additions are predictable. An undersized panel is the most common, followed by too few circuits in kitchens and living areas, outlets placed where furniture will block them, and no spare capacity for future equipment. Another frequent issue is changes made after rough-in, when moving a switch or adding a light means opening finished walls.
Weather and humidity add their own risks. Wire left exposed during construction can be damaged by sun and water, and cheap or mismatched fittings corrode quickly in a salt air environment. Mixing old and new work without checking the existing wiring can hide hazards, such as an overloaded neutral or a bad ground, that only show up under the added load.
We reduce these risks by planning first, building to the code, labeling and documenting what we install, and talking openly about tradeoffs. Sometimes the less expensive route is sensible, and sometimes it is false economy. We say which is which. If an emergency happens during a project or in your existing home, our emergency line is answered, and callers should call to confirm availability.
If something does go wrong after the job, a clear paper trail helps. Keep copies of permits, inspection sign-offs, panel schedules, equipment manuals and the contact details of the people involved. Photographs of walls before they were closed are surprisingly valuable. If a problem appears, we can often trace it faster when records exist, and when it is urgent the emergency line is there; callers should call to confirm availability at the time, since we do not make promises about timing.
Questions we hear about this
When should I involve an electrician in a new build or addition?
As early as the floor plan stage, before framing and before the slab is poured if conduit is needed beneath it. Early involvement lets us size the panel and service, place circuits where you will use them, and avoid costly changes after walls are closed. Even a short planning conversation can prevent most of the common mistakes owners run into.
Will my existing panel handle an addition?
It depends on the panel size, how full it is, its condition and the load the addition brings, especially cooling equipment. We inspect the service and panel, apply the code load calculation, and tell you honestly whether it can carry the new work or whether an upgrade is needed. Sometimes it fits, and sometimes it does not.
Does the work need a permit and inspection?
Where the code requires it, yes. New construction and additions generally involve permitted and inspected electrical work through the local building department, with inspections at stages such as rough-in and final. Requirements differ by city and by scope, so we confirm the process for your location. We cannot promise approvals, but we build to the code.
Can I add a generator connection or surge protection to a new build?
Yes, and a new build is a good time to do it. A proper transfer switch or interlock lets a generator be connected without backfeeding the utility, and a whole-home surge protective device helps protect equipment from lightning and utility events. These should be installed and inspected as part of the electrical plan.
How do you price a new construction or addition job?
Jobs are quoted after we understand the work, based on the plans, the scope and the conditions on site. Some projects need a visit first, and if a service call charge applies it is explained before we are dispatched. We do not give numbers without knowing what is involved, because that leads to surprises later.
What if I have an electrical emergency during construction?
If there is smoke, burning smell, sparking or water near live electrical equipment, get everyone to safety and call emergency services first. If it is safe, turn off power at the main, then call us. We answer an emergency line, and callers should call to confirm availability for their situation.
More Electrical Guides Nearby
- Broward Landlord Electrical Safety Guide
- Broward County Electrical Permits Explained
- Older Broward Homes and Their Wiring
- Broward Commercial Tenant Build-Out Electrical
- Broward Medical and Dental Office Electrical
- Lightning and Power Surges in Broward
- Broward HOA and Community Electrical Guide
- Broward Hurricane Season Electrical Checklist
- All Hollywood pages
- All Broward County guides
- Electrician Near Me in Hollywood, FL
- Emergency Electrician in Hollywood, FL
Content note: this page was written by Claude (AI).
Request Service
Tell us what is happening and we will take it from there
Fill this out and the office gets the whole picture at once: what is wrong, where the property is, how you get in, and when you need somebody. That means the electrician who calls you back already knows the job instead of starting the conversation from zero.
If the power is out or something smells like it is burning, do not type. Call (954) 602-0050. We answer the phone around the clock.
Where We Work
36 cities across three counties
Every city has its own page for planned work, and its own page for after hours. Please choose the name of your city, or tap 24hr for the emergency page.
Broward County
- Coconut Creek24hr
- Cooper City24hr
- Coral Springs24hr
- Dania Beach24hr
- Davie24hr
- Deerfield Beach24hr
- Fort Lauderdale24hr
- Hallandale Beach24hr
- Hillsboro Beach24hr
- Hollywood24hr
- Lauderdale-By-The-Sea24hr
- Lauderdale Lakes24hr
- Lauderhill24hr
- Lighthouse Point24hr
- Margate24hr
- Miramar24hr
- North Lauderdale24hr
- Oakland Park24hr
- Parkland24hr
- Pembroke Park24hr
- Pembroke Pines24hr
- Plantation24hr
- Pompano Beach24hr
- Southwest Ranches24hr
- Sunrise24hr
- Tamarac24hr
- West Park24hr
- Weston24hr
- Wilton Manors24hr